1. In Time study , Why the rating factor is applied ? Ans - fixation of incentive rate2. Why Gantt Chart is used ? Ans - for production scheduling.
3. What is the main purpose of value engineering ? ans - to minimize the cost without changing the quality of the product.
4. Why Scientific Layout is used ? Ans - Minimizing production delay, increasing floor area and ensuring production quality.
5. What Work study involues ?
Ans - work measurement and method study .
6. Why A-B-C analysis is used ?
Ans - For Inventory Control
7. Which class of items are generally large in number in In A-B-C analysis ?
Ans - C .
8. PERT analysis depends on -
Ans - Optimistic, Pessimistic and most likely time.
9. Why Process layout is used ?
Ans- for avoiding excessive multiplication of facilities.
10. What is an element of Queuing Theory ?
ans - Waiting time.
11. What PERT requires ?
ans- triple time estimate.
12. According to break even analysis, how total cost is got ?
ans- by summing fixed cost and variable cost.
13. When Bar Chart is more appropriate to use ?
ans- for minor works.
14. For an activity how Probabilistic time is calculated ?
ans - By optimistic, pessimistic and most likely time.
15. Where Line organization is suitable ?
ans - for small organization.