1. Do you think that PERT is an event oriented technique ? Yes or No .
ans - Yes.
2. Which chart gives simultaneous information of work progress and machine loading?
ans- Man-machine chart.
3. In value engineering what is the meaning of value ?
ans- utility of the product
4. Why work sampling is applied ?
ans- for estimating the percentage utilization of machine tools, estimating percentage time, finding time study in certain situations.
5. Production costs means -
ans- Prime cost + Factory overhead .
6. A systematic job improvement sequence consists -
ans- motion study + job enrichment + time study
7. Do you think that line balancing problem and transportation problem can be solved by Linear programming model ?
ans - Yes .
8. Which chart gives an estimation of amount of materials handling between various work stations ?
ans- travel chart.
9. which is the device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable ?
ans - Hoist.
10. What a flow diagram generally shows ?
ans - The path followed by materials and men while doing a job.
Thanks. These Questions will be helpful as these can be the practice questions for mechanical engineering job interview.